In Arbegui, moving large loads efficiently is fundamental. For this, we always have the best materials, resources and professionals, in order to carry out the work with commitment. Everything that helps to add in this type of advantages is good, for that reason, we have announced that a collaboration agreement has been signed with the company Mammoet.
Read more ...
Our mission has been to transport a 140 TN transformer from the factory to the electrical substation, placing it in its final position on the bench.
Being a piece with a lot of height, the transport required the use of one of our beam equipment, specifically the 200 tn. of capacity with modular trailers of 4 and 6 axes.
Read more ...
For the installation of this press it was necessary to carry out a very exhaustive study, due to two constraints, the limited space that we had, and the requirement not to reduce the production rate of the factory.
To comply with these requirements, it was necessary to use three hydraulic gantries.
Read more ...